So good last couple days were had. I received my new sump Thursday and when Inwent to install I forgot that with the drip pan and the flooring material I put underneath it raised the sump 3/4”. That being said I had to remove the drain plumbing and cut 3/4” out and put coupling to put it back together. course I needed 3 and only had 2. Note to anyone in a pinch if you need ScH80 fittings in a pinch FW Webb carries it all (for 4X the cost of Bulk reef)
anyhow I finished the last pipe today. installed the sump and plugged all drains to fill the EXT overflow to make sure there are no seal leaks there. Hopefully tomorrow we do a water test and no more problems.
anyhow I finished the last pipe today. installed the sump and plugged all drains to fill the EXT overflow to make sure there are no seal leaks there. Hopefully tomorrow we do a water test and no more problems.