I am in the plumbing stage of setting up my new tank and was wondering if someone could help me out. I am using both overflow holes as the drain and emergency drain with the return coming up the back using an oceans motions 2way. The main drain will be with pvc and the emergency will be using flexible pvc or spaflex. My question is after the bulkhead i want to have unions and I don't know exactly what type I need for the flex pvc. Also do I need any type of fitting after the bulkhead or should I glue the pvc right to it then the union. Thanks. Bill