rejection ratio is 4 to 1, then you'll use 50 gallons of hot water every time you make a 25g water change!
I run my RO feed line through 25' of tubing coiled in a 5 gal bucket with a heater. Not sure it's worth it, but that's what I do....
Aha....the ghetto feed system......it works
Jim
I run my RO feed line through 25' of tubing coiled in a 5 gal bucket with a heater. Not sure it's worth it, but that's what I do....
We use essential cookies to make this site work, and optional cookies to enhance your experience.