nitr8
Non-member
I finally got around to setting up my RODI unit. I've been working on it for the last two days and I'm nearly complete. All I have left is to install some more cable covers down the wall and to install a spigot at the bottom of the barrel. I did a test run earlier today and let it run at about 55 psi for one hour and then opened the flush valve for an additional 30 minutes. Everything seems to be in working order with no leaks. The TDS meter says the the water input into the DI chambers is at about 10 ppm and 0 ppm upon exit. The water supply comes from under my bathroom sink in the next room over from where the storage container is kept. Here some photos as the build progressed.