How much time is allowed when assembling a new PVC plumbing system to a new reef ready setup and the PVC adhesive used to cure before adding any water to the system?
+1 on about 15 mins... I used to work for a pool company as a service tech and did some plumbing on much higher pressure stuff and would only wait about 15-30 mins for that stuff...
Within a minute or two of applying the glue the joint is ready for use.Unless the temperature is colder than 50 deg.In that case the glue dries much more slowly.
As a side note, on a whim I read directions on primer and glue cans. It said not to prime ABS (the black bulkheads purchased online are mostly ABS plastic). I had been priming them...