Any last minute suggestions?
I 've got Weldon 3, and was planning on applying it in "one shot" on the inside seams. Once dry and proven water tight ... Baffles will be inserted and glued.
Once dry ... is it worth untaping and applying a second Weldon pass on the outside seams?
It's taped flush ... I could clamp it, but I hear that could effect the capalilary action ... any truth to that?
The game plan is a sump/crypt. It's 4' x 16W x 13H ... overflows will feed into both ends and water will be returned from the center. Don't expect the water to be more than ~ 8" deep.
I 've got Weldon 3, and was planning on applying it in "one shot" on the inside seams. Once dry and proven water tight ... Baffles will be inserted and glued.
Once dry ... is it worth untaping and applying a second Weldon pass on the outside seams?
It's taped flush ... I could clamp it, but I hear that could effect the capalilary action ... any truth to that?
The game plan is a sump/crypt. It's 4' x 16W x 13H ... overflows will feed into both ends and water will be returned from the center. Don't expect the water to be more than ~ 8" deep.